Under
construction
Click the thumbnails for larger versions
Looking
toward the front of the room. The first support of the rear seating is
in place.
The
2x2's on one of the exterior walls are glued and screwed with Tapcon
concrete anchors to prevent vibration.
This
is a view looking at the future equiment rack wall. The audio and
video equipment will be mounted in a Middle Atlantic rack. DVD storage
is also planned under the stairs.
Showing
the stage from outside the theater. The step up into the theater will be
in the recessed area of the framing. We are planning on using glass
block under the stair treads and putting a light behind. Should be
interesting.
Again,
from the rear
Here's
a detail of the platform/floor joint. Strips of 30lb felt (tarp paper)
were put underneath the 2x10s. Construction adhesive was was then spread
on each side and on all the joints. The attempt is to eliminate all
sources of vibration.
Looking
from the front of the theater to the rear. A recessed spot is left for
seating in the middle. Stairs will be built on either side.