HVAC-Platform 2/27/01
 

 

 

 

Back ] Up ] Next ]

Under construction
Click the thumbnails for larger versions

PIC00028.jpg (162749 bytes) The latest view from the front. The lighted glass block stairs are complete and covered.
PIC00015.jpg (153288 bytes)PIC00016.jpg (147576 bytes) The first layer of insulation is installed to cut down on on noise from the platform.
PIC00017.jpg (160184 bytes) The second layer is in a the sub-floor (1/2" osb) is glued and screwed. 
PIC00018.jpg (163604 bytes)
PIC00019.jpg (164668 bytes)
Sub-floor complete
PIC00026.jpg (168456 bytes)
PIC00027.jpg (148988 bytes)
The final layer is 3/4" MDF. Screwed and glued. The floor of the platform is pretty dead quiet now.
PIC00020.jpg (167457 bytes)
PIC00021.jpg (187877 bytes)
The heat ducts for the theater are run where the columns will be. 
PIC00023.jpg (173548 bytes) The cold air returns are in the ceiling close to the back of the room
PIC00024.jpg (169212 bytes) This is a detail of the projector mounting re-enforcement and exhaust duct for the hush box.
PIC00025.jpg (178224 bytes)
PIC00022.jpg (191668 bytes)
These are a few shots out of the theater into the bar area. 

All trademarks used are properties of their respective owners
Copyright ©1998-2000, Ron Hanson. All rights reserved
Last edited 12/24/2003