Under
construction
Click the thumbnails for larger versions
The
wiring mess at the equipment rack area.
This
is looking into the game room. This will be a hallway at the
bottom of the steps. Someday.
Standing
at the theater steps, looking into the game room. The wet bar will
be on the left side.
Standing
in the game room looking into the theater. All the soffits were glued
and screwed.
The
same view except standing at the steps. The Hvac ducts will be in
columns. Extra care is taken to make sure nothing can rattle behind the
sheetrock. Glue all over the place
You
can see the soffit construction here, it was mirrored on both
sides. The extra 2x2 on the outside will hold rope lighting. It will be
capped with a 1x3 to hide the rope light from view.
Standing
in the front left corner of the theater looking back to the equipment
rack and DVD storage area.
Front
left, looking back.
Older
shot of the front stage being filled with insulation prior to covering.